A40/A3220 West Cross Route, London, Kensington And Chelsea
05 May — 06 May
Delays likely Lane closure
Works location: A40/A3220
Works description: Cms/Led Maintenance Works Lane 2 Closure S/B 22:00 To 05:00
Responsibility for works: Transport For London
Current status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
05 May — 06 May
Delays likely Lane closure
Works location: A40
Works description: Pre Scheme Topographical Survey, Drainage And Pavement Investigation Works Phase 1) Lane 1 Eastbound Closure And Lane 1 On Exit Slip Road Closure. 23.00 - 05.00 Phase 2) Lane 1 Eastbound Closure Of Westway And Lane 1 On Off-Slip, Maintaining 2 Running Lanes On The A40 And 2 Running Lanes On The Off-Slip. 22.00 - 05.00
Responsibility for works: Transport For London
Current status: Planned work about to start
B408 Dalling Road, London, Hammersmith And Fulham
05 May — 11 May
Delays likely Road closure
Works location: B408
Works description: Alter And Relay Domestic Service 9m From Main In Footway And Carriageway
Responsibility for works: National Grid Gas Plc
Current status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
05 May — 07 May
Delays possible Some carriageway incursion
Works location: A219
Works description: Install 9m Of 1 Way Poly Duct In Footway,Provide 2 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Planned work about to start
A315/B408 Glenthorne Road, London, Hammersmith And Fulham
05 May — 18 May
Delays possible Some carriageway incursion
Works location: A315/B408
Works description: Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):Lay New Service 77-89 Glenthorne Road W6 0li - Excavate 30m For Ducts And Lay 300mm Wv 400a Cable From 61 To 89 And 1 X Lv Joint Hole Outside 61.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A315 Hammersmith Road, London, Hammersmith And Fulham
06 May — 07 May
Delays possible Some carriageway incursion
Works location: A315
Works description: Customer Connection. New Residential Supply. Clear Blocked Duct & Repair Blockages If Found. Footway Works Only.
Responsibility for works: Virgin Media
Current status: Planned work about to start
A3220 Addison Crescent, London, Kensington And Chelsea
05 May — 05 May
Delays possible Some carriageway incursion
Works location: A3220
Works description: Thames Water Need To Carry Out Works On The Water Valve. A Road Narrowing System Will Be Installed To Allow These Works To Be Carried Out. Minor Works, No Excavation.
Responsibility for works: Thames Water
Current status: Planned work about to start
A3220 Addison Road, London, Kensington And Chelsea
05 May — 05 May
Delays possible Some carriageway incursion
Works location: A3220
Works description: Thames Water Need To Carry Out Works On The Water Valve. A Road Narrowing System Will Be Installed To Allow These Works To Be Carried Out. Minor Works, No Excavation.
Responsibility for works: Thames Water
Current status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
06 May — 07 May
Delays possible Some carriageway incursion
Works location: B408
Works description: Remedial Works Only
Responsibility for works: BT
Current status: Planned work about to start
Cathnor Road, London, Hammersmith And Fulham
05 May — 07 May
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Hammersmith and Fulham London Borough Council
Current status: Planned work about to start
 
 
Iffley Road, London, Hammersmith And Fulham
06 May — 07 May
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: Virgin Media
Current status: Planned work about to start

 

Information supplied by Roadworks.org

 

 