Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our free newsletter

Comment on this story on the

A40/A3220 West Cross Route, London, Kensington And Chelsea
13 June — 14 June Lane closure
Delays likely due to Streetworks
Removal Of Crane Part Outer Ring S/E Part Of Rbt 07:00 To 18:00 at A40/A3220
Responsibility: Transport For London
EToN status: Planned work about to start
Blythe Road, London, Hammersmith And Fulham
13 June — 14 June Traffic control (two-way signals)
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Wood Lane, London, Hammersmith And Fulham
12 June — 16 June Some carriageway incursion
Delays possible due to Streetworks
To Rectify Defect In Footway - Blocks. at A219
Responsibility: Southern Electric
EToN status: Planned work about to start
A315 Kensington High Street, London, Kensington And Chelsea
12 June — 15 June Some carriageway incursion
Delays possible due to Streetworks
District Metering X-Bond - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
12 June — 16 June Some carriageway incursion
Delays possible due to Streetworks
Carry Out Boundary Box Exchange In The Footway In Footway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase at A4020
Responsibility: Thames Water
EToN status: Planned work about to start
Bulwer Street, London, Hammersmith And Fulham
13 June — 16 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start

Information supplied by Roadworks.org

 

 

 