Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Butterwick, London, Hammersmith And Fulham
19 June — 23 June Lane closure
Delays likely due to Streetworks
Excavation - Replacement Of Existing Telecommunications Mast. Day 1 Install New Ductwork With Pedestrian Manaement. Day 2 (Sunday)Swap Existing Telecomms Mast With New Mast Using Hiab, Lane Closure In Operation. Day 3 Complete Works And Reinstate Site at A219
Responsibility: T-Mobile (UK)Limited
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
19 June — 20 June Lane closure
Delays likely due to Streetworks
Wp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Offside Lane Closures With Nearside Lane Running - All Vehicle Movements Maintained Eb 23:00 05:00 Slip No Nw12-0316 at A40
Responsibility: Transport For London
EToN status: Advanced planning
A40 Westway, London, Hammersmith And Fulham
19 June — 20 June Lane closure
Delays likely due to Streetworks
Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Offside Lane Closures With Nearside Lane Running - All Vehicle Movements Maintained Wb 23:00 To 05:00 Slip No Nw12-0316 at A40
Responsibility: Transport For London
EToN status: Advanced planning
A40 Westway, London, Hammersmith And Fulham
19 June — 20 June Lane closure
Delays likely due to Streetworks
Lscrp - Installation And Alignment Of Average Speed Cameras And Gps Plotting Of Capture Zone Across All Lanes. Requires Precise Plotting On Carriageway Lanes 1 & 2 Of 3 Closure, Followed By Switch To Lanes 2 & 3 Of 3, Westbound, 1000m East Of And 50m After Location Description Working Hour: 22.00 - 05.00 Weekdays at A40
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
20 June — 21 June Some carriageway incursion
Delays possible due to Streetworks
2xdisconnections In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
19 June — 22 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Work To Rectify Ha Defect at A4020
Responsibility: BT
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
20 June — 21 June Some carriageway incursion
Delays possible due to Streetworks
Lscrp - Groundworks For The Installation Of Average Speed Equipment On Footway For 10m From Location Description Working Hour: 07.00 - 17.00 Weekend at A40
Responsibility: Transport For London
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
20 June — 23 June Some carriageway incursion
Delays possible due to Streetworks
Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
20 June — 23 June Some carriageway incursion
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found. Footway Works Only. at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
Melbury Road, London, Kensington And Chelsea
19 June — 19 June Traffic control (two-way signals)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

Information supplied by Roadworks.org

 

 

 

June 19, 2015