Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Wood Lane, London, Hammersmith And Fulham
29 June — 11 July Lane closure
Delays likely due to Streetworks
Retaining Wall Works Lane 1 Closure And Localized Pedestrian Management On Footway. 1.2m Clearance To Be Kept At All Times. 22:00 - 05:30 at A219
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Wood Lane, London, Hammersmith And Fulham
29 June — 16 July Lane closure
Delays likely due to Streetworks
Connections Projects:New Service: (Approx Depth 450mm-600mm):Lay Ducts From 10m South Of Bbc Tv Centre North Entrance Across Carriageway To Opposite Footway. Excavate 2 Hv Joint Holes, Excavate Half And Half Road Crossing Reinstating 1st Half Before Excavating The Second Half And Pull Cable Across Carriageway. at A219
Responsibility: UK Power Networks
EToN status: Planned work about to start
A315/B408 Glenthorne Road, London, Hammersmith And Fulham
29 June — 14 July Lane closure
Delays likely due to Streetworks
Installation Of Telecoms, Chambers And Ducts In C/W at A315/B408
Responsibility: City of London Telecomms
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
30 June — 30 June Traffic control (Stop/Go boards)
Delays likely due to Streetworks
11/117 - Installation Of Magnetomer Studs Under Scoot Contract For Tfl Sd0 Short Stay, E/B Lane 1 Closed, 1000 - 1500 at A315
Responsibility: Transport For London
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
30 June — 02 July Road closure
Delays likely due to Streetworks
Wp Cyclical Routine Maintenance Full Closure & Diversions Nb Closure 3006 Sb Closure 0107 2300 To 0500 Tro Ref Gla 2010 No.144 at A40/A3220
Responsibility: Transport For London
EToN status: Advanced planning
A4020 Uxbridge Road, London, Hammersmith And Fulham
30 June — 02 July Traffic control (priority working)
Delays likely due to Streetworks
Install 1m Of 1 Way Poly Duct In Carriageway,Install 2m Of 1 Way Poly Duct In Footway,Provide 2 Core Drill(S) Into Jointbox Or Building at A4020
Responsibility: BT
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
29 June — 11 July Road closure
Delays likely due to Streetworks
Retaining Wall Works Full Closure 22:00 - 05:30 Tman Ref N1400443-001-W001 at A40
Responsibility: Transport For London
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
29 June — 30 June Lane closure
Delays likely due to Streetworks
Interim To Permanent Reinstatement at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
Bradmore Park Road, London, Hammersmith And Fulham
29 June — 14 July Road closure
Delays likely due to Streetworks
- at -
Responsibility: City of London Telecomms
EToN status: Planned work about to start
West Cross Route (A3220), London, Hammersmith And Fulham
30 June — 02 July Road closure
Delays likely due to Streetworks
- at -
Responsibility: Transport For London
EToN status: Advanced planning
A315 King Street, London, Hammersmith And Fulham
29 June — 30 June Some carriageway incursion
Delays possible due to Streetworks
Remedial Ha Defect To Replace Chipped York Stone at A315
Responsibility: BT
EToN status: Planned work about to start
A315 King Street, London, Hammersmith And Fulham
29 June — 06 July Some carriageway incursion
Delays possible due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120956 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at A315
Responsibility: UK Power Networks
EToN status: Planned work about to start
A315 Studland Street, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at A315
Responsibility: BT
EToN status: Planned work about to start
A3220 Addison Road, London, Kensington And Chelsea
30 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Maintenance - Repatch - Failed Patch Area 1m Sq Part Lane 1 And Part F/W Closure at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Install 1m Of 1 Way Poly Duct In Footway at A4020
Responsibility: BT
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Fire Hydrant Standard Repair In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A4020
Responsibility: Thames Water
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
Lscrp - Installation Of Pole Bases On Footway For 30m From Location Description W Working Hour: 08.00 - 17.00 Weekdays at A40
Responsibility: Transport For London
EToN status: Planned work about to start
B412 St Mark'S Road, London, Kensington And Chelsea
29 June — 03 July Some carriageway incursion
Delays possible due to Streetworks
Disconnect 1 X 63mm Pe Service From Main In Footway at B412
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Blythe Road, London, Hammersmith And Fulham
30 June — 02 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start
Blythe Road, London, Hammersmith And Fulham
30 June — 03 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Cornwall Crescent, London, Kensington And Chelsea
29 June — 03 July Traffic control (multi-way signals)
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Iffley Road, London, Hammersmith And Fulham
29 June — 01 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

 

Information supplied by Roadworks.org

 

 

 

June 29, 2015