Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 26 August Lane closure
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
25 August — 27 August Road closure
Delays likely due to Streetworks
Carriageway Resurfacing & Lining at A219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
25 August — 27 August Road closure
Delays likely due to Streetworks
Carriageway Resurfacing & Lining at A219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A219 Wood Lane, London, Hammersmith And Fulham
25 August — 26 August Traffic control (two-way signals)
Delays likely due to Streetworks
Installa New Network Valve In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
26 August — 26 August Road closure
Delays likely due to Streetworks
Expansion Joints Monitoring Inspection Full Closure & Diversions Entry Slip Nb 0000 To 0400 at A40/A3220
Responsibility: Transport For London
EToN status: Advanced planning
A402 Holland Park Avenue, London, Kensington And Chelsea
25 August — 26 August Lane closure
Delays likely due to Streetworks
11/091 Tel35464 - Access Pole 27, Green Aspect Out And Pole 26 Red Aspect Out On 6m Pole, 22:00-05:00, Ped Access Maintained. at A402
Responsibility: Transport For London
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
26 August — 28 August Lane closure
Delays likely due to Streetworks
Installation And Alignment Of Average Speed Camera. at A40
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway at A219
Responsibility: BT
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Fire Hydrant Standard Repair In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at B408
Responsibility: Thames Water
EToN status: Planned work about to start
Pennard Road, London, Hammersmith And Fulham
26 August — 27 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Sinclair Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
Upper Addison Gardens, London, Kensington And Chelsea
26 August — 26 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Weltje Road, London, Hammersmith And Fulham
25 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

 

 

Information supplied by Roadworks.org

 

 

 

August 25, 2015