A219 Fulham Palace Road, London, Hammersmith And Fulham
05 October — 18 October Road closure
Delays likely due to Streetworks
Road Or Lane Closure Of Fulham Palace Road Northbound And Southbound. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A219
Responsibility: Transport For London
EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea
05 October — 06 October Traffic control (two-way signals)
Delays likely due to Streetworks
Maintenance - Patch Cracking Around Metal Cover 2 Way Lights at A3220
Responsibility: Transport For London
EToN status: Planned work about to start

A4 Talgarth Road, London, Hammersmith And Fulham
05 October — 18 October Lane closure
Delays likely due to Streetworks
South Side Of Gyratory Lane Closures To Enable Single Lane Running As Agreed Between Borough And Tfl. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A4
Responsibility: Transport For London
EToN status: Planned work about to start

B408 Askew Road, London, Hammersmith And Fulham
05 October — 16 October Traffic control (two-way signals)
Delays likely due to Streetworks
Construct Chamber Over 30" Main In C/W And Drill Main And Install Valve at B408
Responsibility: Thames Water
EToN status: Planned work about to start

A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
05 October — 07 October Some carriageway incursion
Delays possible due to Streetworks
Main Clamp 0 To 6" In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start

A219 Wood Lane, London, Hammersmith And Fulham
05 October — 19 October Some carriageway incursion
Delays possible due to Streetworks
Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):(Ntr) Wood Lane, London W12 7rq - Install 1 X Hv And 1 X Lv Duct From North Side Of M&S Access Road To Near Pelican Crossing, Excavate 2 X Hv Joint Holes And 5 X Lv Joint Holes, The Line Of The Ducts Is Inside Existing Kerb Line Though Will Be In Carrigeway When Crossing M&S Access Road, Pull 45m 300cu Triplex And 45m 35mm 1c Into Ducts at A219
Responsibility: UK Power Networks
EToN status: Planned work about to start

A315 King Street, London, Hammersmith And Fulham
05 October — 23 October Some carriageway incursion
Delays possible due to Streetworks
Imga160061. Excavate And Replace 25m Of 150mm Di Gas Main With New 125mmpe Pipe. Transfer Services To No 182, 184, 186, 188 Kingsstreet. at A315
Responsibility: National Grid Gas Plc
EToN status: Advanced planning

A3220 Holland Road, London, Kensington And Chelsea
06 October — 07 October Some carriageway incursion
Delays possible due to Streetworks
Interim To Permanent Reinstatement In Footway Only - We Are Exempt From The Lane Rental Scheme, As Our Works Will Be Actioned Outside Of The Restricted Hours. at A3220
Responsibility: Virgin Media
EToN status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham
05 October — 07 October Some carriageway incursion
Delays possible due to Streetworks
Manifold 4p Exchange In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A4020
Responsibility: Thames Water
EToN status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham
06 October — 07 October Some carriageway incursion
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A4020
Responsibility: Virgin Media
EToN status: Planned work about to start

Australia Road, White City Estate, London, Hammersmith And Fulham
06 October — 08 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

B408 Dalling Road, London, Hammersmith And Fulham
05 October — 23 October Some carriageway incursion
Delays possible due to Streetworks
Imga160061. In Conjunction With Works Taking Place In King Street. at B408
Responsibility: National Grid Gas Plc
EToN status: Advanced planning

B408 Dalling Road, London, Hammersmith And Fulham
06 October — 08 October Some carriageway incursion
Delays possible due to Streetworks
Installation Of Street Cabinet Next To Speed Restriction Sign For Cctv at B408
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

Blythe Road, London, Hammersmith And Fulham
05 October — 12 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

Blythe Road, London, Hammersmith And Fulham
05 October — 12 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

Cobbold Road, London, Hammersmith And Fulham
06 October — 07 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start

Hammersmith Grove, London, Hammersmith And Fulham
05 October — 08 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

Hammersmith Grove, London, Hammersmith And Fulham
05 October — 09 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start

Rivercourt Road, London, Hammersmith And Fulham
05 October — 28 December Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

Sinclair Road, London, Hammersmith And Fulham
06 October — 08 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start

 

 

 