Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our Shepherd's Bush newsletter

Comment on this story on the

A40 Westway, London, Hammersmith And Fulham
14 November — 15 November Road closure
Delays likely due to Streetworks
Additional Epa Cleansing Full Closure & Diversions. 2359 - 0800 at A40
Responsibility: Transport For London
EToN status: Planned work about to start

Bradmore Park Road, London, Hammersmith And Fulham
14 November — 22 November Road closure
Delays likely due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

A219 Wood Lane, London, Hammersmith And Fulham
14 November — 15 November Some carriageway incursion
Delays possible due to Streetworks
Installation Of Telecom Ducts And Chambers In F/W And C/W - Tm Drawings To Follow - 2 Way Traffic To Be Maintained As Per Site Meeting at A219
Responsibility: euNetworks
EToN status: Planned work about to start

A3220 Addison Road, London, Kensington And Chelsea
13 November — 14 November Some carriageway incursion
Delays possible due to Streetworks
Maintenance: Relay- 9 Uneven Slabs 1 900 3 600 5 750 Area 3.87m Sq Part F/W Part Lane 1 at A3220
Responsibility: Transport For London
EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea
13 November — 15 November Some carriageway incursion
Delays possible due to Streetworks
Core Drill Into Chamber To Connect New Client at A3220
Responsibility: Virgin Media
EToN status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham
13 November — 16 November Some carriageway incursion
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A4020
Responsibility: Virgin Media
EToN status: Planned work about to start

Australia Road, White City Estate, London, Hammersmith And Fulham
13 November — 17 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

B408 Paddenswick Road, London, Hammersmith And Fulham
13 November — 13 November Some carriageway incursion
Delays possible due to Streetworks
Trial Dig To Determine Existing Underground Services. All Slg Will Be Limited To Fw. No Cw Incursion. 1.2m Will Be Maintained For Peds. at B408
Responsibility: Vodafone Group
EToN status: Planned work about to start

B450 Ladbroke Grove, London, Kensington And Chelsea
13 November — 17 November Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B450
Responsibility: BT
EToN status: Planned work about to start

Bramley Road, London, Kensington And Chelsea
14 November — 18 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

Bramley Road, London, Kensington And Chelsea
14 November — 18 November Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start


 

Information supplied by Roadworks.org

 

 

 

November 13, 2015