Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our Shepherd's Bush newsletter

Comment on this story on the

A219 Shepherd'S Bush Road, London, Hammersmith And Fulham

04 January — 05 January Lane closure

Delays likely due to Streetworks
Interim To Permanent Reinstatement In The Carriageway at A219

Responsibility: Virgin Media

EToN status: Planned work about to start

A219 Shepherd'S Bush Road, London, Hammersmith And Fulham

05 January — 05 January Contra-flow

Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A219

Responsibility: BT

EToN status: Planned work about to start

A40 Westway, London, Hammersmith And Fulham

04 January — 05 January Road closure

Delays likely due to Streetworks
Expansion Joints Monitoring Inspection Full Closure & Diversions, E/B 23:59 - 04:00 at A40

Responsibility: Transport For London

EToN status: Planned work about to start

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lane 3 W/B at A4

Responsibility: Transport For London

EToN status: Advanced planning

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Full Closure & Diversions E/B at A4

Responsibility: Transport For London

EToN status: Planned work about to start

B450 Ladbroke Grove, London, Kensington And Chelsea

04 January — 05 February Traffic control (two-way signals)

Delays likely due to Streetworks
Excavate In Existing 30" St Mp Main, Flow Stop Main And Abandon 72mof30"St Mp Gas Main. at B450

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

Blythe Road, London, Hammersmith And Fulham

04 January — 12 January Traffic control (two-way signals)

Delays likely due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

West Cross Route (A3220), London, Hammersmith And Fulham

04 January — 20 March Road closure

Delays likely due to Streetworks
- at -

Responsibility: Transport For London

EToN status: Advanced planning


 

Information supplied by Roadworks.org

 

 

 

January 4, 2016