Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our Shepherd's Bush newsletter

Comment on this story on the

A219 Wood Lane, London, Hammersmith And Fulham

25 January — 05 February Some carriageway incursion

Delays possible due to Streetworks
Capital Programmes:Project::Trial Hole Excavation To Route Prove The Proposed Installation Of 2 X 132kv Cable Circuit On Behalf Of Uk Power Networks at A219

Responsibility: UK Power Networks

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

24 January — 25 January Some carriageway incursion

Delays possible due to Streetworks
Maintenance: Failed Patch/Cracking Around 2 Metal Covers Part Lane 1 And Bay Suspended at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

25 January — 31 January Some carriageway incursion

Delays possible due to Streetworks
Standard Permanent Works To Replace Temp Wrapped Leaking Gas Supply. at A3220

Responsibility: National Grid Gas Plc

EToN status: Planned work about to start

A402 Holland Park Avenue, London, Kensington And Chelsea

25 January — 08 February Some carriageway incursion

Delays possible due to Streetworks
Paving Works - 140m2 at A402

Responsibility: Kensington and Chelsea Royal Borough Council

EToN status: Advanced planning


 

Information supplied by Roadworks.org

 

 

 

January 25, 2016