Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our Shepherd's Bush newsletter

Comment on this story on the

A40 Westway, London, Hammersmith And Fulham

04 April — 05 April

Delays likely Road closure

Works location: A40

Works description: Expansion Joints Monitoring Inspection Full Closure & Diversions, W/B 23:59 - 04:00

Responsibility for works: Transport For London

Current status: Advanced planning

Bramley Road, London, Kensington And Chelsea

04 April — 08 April

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: Kensington and Chelsea Royal Borough Council

Current status: Planned work about to start

South Africa Road, London, Hammersmith And Fulham

04 April — 06 April

Delays likely Traffic control (Stop/Go boards)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

A219 Wood Lane, London, Hammersmith And Fulham

31 March — 09 April

Delays likely Traffic control (two-way signals)

Works location: A219

Works description: Signals - Tfl Traffic Signal Modernisation Works F/W: Installation Of Link Ducts, Nal Base & Pits. C/W: Installation Of New Link Duct Crossing Across Entrance To Bridge (On Wood La) To Be Done Half And Half During Week Night With Full Time Temps With Ped Facilities C/W Link Duct Road Crossing To Be Done Half And Half To Allow Access At All Times. Installation Of C/W Duct To Be Done Nights, With Full Time Temps With Ped Facilities

Responsibility for works: Transport For London

Current status: Planned work about to start

 

Information supplied by Roadworks.org

 

 

 

April 4, 2016