Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
| A219 Wood Lane, London, Hammersmith And Fulham |
| 14 August — 14 August Traffic control (two-way signals) |
Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A40 Westway, London, Kensington And Chelsea |
| 14 August — 15 August Lane closure |
Delays likely due to Streetworks
Trial Holes On The Westway Flyover. Single Lane Closure 23.00 To 05.00. Westbound Carriageway at A40 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A219 Butterwick, London, Hammersmith And Fulham |
| 14 August — 15 August Some carriageway incursion |
Delays possible due to Streetworks
Principal Inspection Of Cctv Camera Mast On Splitter Island Lane 2 Restriction (Only 15m Length) 2230 To 0200 at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 15 August — 15 August Some carriageway incursion |
Delays possible due to Streetworks
Maintenance - Relay 5 Uneven 600mm Slabs& Concrete Fillet Around Cover Part F/Way Part Lane 1 at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|