Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 26 August Lane closure
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
25 August — 27 August Road closure
Delays likely due to Streetworks
Carriageway Resurfacing & Lining at A219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
25 August — 27 August Road closure
Delays likely due to Streetworks
Carriageway Resurfacing & Lining at A219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A219 Wood Lane, London, Hammersmith And Fulham
25 August — 26 August Traffic control (two-way signals)
Delays likely due to Streetworks
Installa New Network Valve In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A40/A3220 West Cross Route, London, Kensington And Chelsea
26 August — 26 August Road closure
Delays likely due to Streetworks
Expansion Joints Monitoring Inspection Full Closure & Diversions Entry Slip Nb 0000 To 0400 at A40/A3220
Responsibility: Transport For London
EToN status: Advanced planning
A402 Holland Park Avenue, London, Kensington And Chelsea
25 August — 26 August Lane closure
Delays likely due to Streetworks
11/091 Tel35464 - Access Pole 27, Green Aspect Out And Pole 26 Red Aspect Out On 6m Pole, 22:00-05:00, Ped Access Maintained. at A402
Responsibility: Transport For London
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
26 August — 28 August Lane closure
Delays likely due to Streetworks
Installation And Alignment Of Average Speed Camera. at A40
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway at A219
Responsibility: BT
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Fire Hydrant Standard Repair In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at B408
Responsibility: Thames Water
EToN status: Planned work about to start
Pennard Road, London, Hammersmith And Fulham
26 August — 27 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Sinclair Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
Upper Addison Gardens, London, Kensington And Chelsea
26 August — 26 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Weltje Road, London, Hammersmith And Fulham
25 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

 

 

Information supplied by Roadworks.org

 

 

 

August 25, 2015


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush