| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lane Closure Of Fulham Palace Road Northbound And Southbound. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A219 Queen Caroline Street, London, Hammersmith And Fulham |
| 31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lanel Closures Of Queen Caroline Street With Agreed Diversion Route. Part Of The Hammersmith Flyover Finishing Works Which Include Reinstatement And Ligthing Works. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 01 September — 02 September Lane closure |
Delays likely due to Streetworks
Carriageway Resurfacing; Hbdwy Box Juntion Mma Anti-Skid at A219 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
| 31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lanel Closures Of Hammersmith Bridge Road Northbound And Southbounda S Part Of Finishing Works Including Reinstatement And Lighting Works. at A306 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
| 01 September — 04 September Road closure |
Delays likely due to Streetworks
Carriageway Resurfacing; Hbr Resurfacing Works & Lining at A306 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
|
|
| A40/A3220 West Cross Route, London, Kensington And Chelsea |
| 01 September — 02 September Lane closure |
Delays likely due to Streetworks
Irontech Manholes& Rodding Eyes Inner Switch Outer Ring Nb/Sb/Eb/Wb at A40/A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 01 September — 03 September Lane closure |
Delays likely due to Streetworks
Repair To A Section 81 Fire Hydrant In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A4020 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| B450 Ladbroke Grove, London, Kensington And Chelsea |
| 01 September — 13 October Traffic control (two-way signals) |
Delays likely due to Streetworks
Paving Works - 280m2 at B450 |
| Responsibility: Kensington and Chelsea Royal Borough Council |
| EToN status: Planned work about to start |
|
|
|
|
|
| A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
| 01 September — 04 September Some carriageway incursion |
Delays possible due to Streetworks
Carriageway Resurfacing; Hbr Resurfacing Works & Lining at A306 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| A3220 Addison Road, London, Kensington And Chelsea |
| 01 September — 03 September Some carriageway incursion |
Delays possible due to Streetworks
Horts - Tree Pruning, Day Works Due To Dangerous Machinery Part F/W Part Lane 1, Only 1 Tree To Be Pruned At A Time at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 01 September — 02 September Some carriageway incursion |
Delays possible due to Streetworks
Maintenance - Resurface Cracking Around Gully With Sma In Lane 1 Susp Bs 1791 Part F/Way Part Lane 1 at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 01 September — 02 September Some carriageway incursion |
Delays possible due to Streetworks
Repair Patch- Remedial Reinstatement In The Footway at A4020 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
| B408 Dalling Road, London, Hammersmith And Fulham |
| 01 September — 03 September Some carriageway incursion |
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
| Blythe Road, London, Hammersmith And Fulham |
| 01 September — 07 September Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
|
|