|
| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 05 October — 18 October Road closure |
Delays likely due to Streetworks
Road Or Lane Closure Of Fulham Palace Road Northbound And Southbound. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 05 October — 06 October Traffic control (two-way signals) |
Delays likely due to Streetworks
Maintenance - Patch Cracking Around Metal Cover 2 Way Lights at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A4 Talgarth Road, London, Hammersmith And Fulham |
| 05 October — 18 October Lane closure |
Delays likely due to Streetworks
South Side Of Gyratory Lane Closures To Enable Single Lane Running As Agreed Between Borough And Tfl. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A4 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| B408 Askew Road, London, Hammersmith And Fulham |
| 05 October — 16 October Traffic control (two-way signals) |
Delays likely due to Streetworks
Construct Chamber Over 30" Main In C/W And Drill Main And Install Valve at B408 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 05 October — 07 October Some carriageway incursion |
Delays possible due to Streetworks
Main Clamp 0 To 6" In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| A219 Wood Lane, London, Hammersmith And Fulham |
| 05 October — 19 October Some carriageway incursion |
Delays possible due to Streetworks
Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):(Ntr) Wood Lane, London W12 7rq - Install 1 X Hv And 1 X Lv Duct From North Side Of M&S Access Road To Near Pelican Crossing, Excavate 2 X Hv Joint Holes And 5 X Lv Joint Holes, The Line Of The Ducts Is Inside Existing Kerb Line Though Will Be In Carrigeway When Crossing M&S Access Road, Pull 45m 300cu Triplex And 45m 35mm 1c Into Ducts at A219 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
|
| A315 King Street, London, Hammersmith And Fulham |
| 05 October — 23 October Some carriageway incursion |
Delays possible due to Streetworks
Imga160061. Excavate And Replace 25m Of 150mm Di Gas Main With New 125mmpe Pipe. Transfer Services To No 182, 184, 186, 188 Kingsstreet. at A315 |
| Responsibility: National Grid Gas Plc |
| EToN status: Advanced planning |
|
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 06 October — 07 October Some carriageway incursion |
Delays possible due to Streetworks
Interim To Permanent Reinstatement In Footway Only - We Are Exempt From The Lane Rental Scheme, As Our Works Will Be Actioned Outside Of The Restricted Hours. at A3220 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 05 October — 07 October Some carriageway incursion |
Delays possible due to Streetworks
Manifold 4p Exchange In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A4020 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 06 October — 07 October Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A4020 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
|
|
| B408 Dalling Road, London, Hammersmith And Fulham |
| 05 October — 23 October Some carriageway incursion |
Delays possible due to Streetworks
Imga160061. In Conjunction With Works Taking Place In King Street. at B408 |
| Responsibility: National Grid Gas Plc |
| EToN status: Advanced planning |
|
|
|
| B408 Dalling Road, London, Hammersmith And Fulham |
| 06 October — 08 October Some carriageway incursion |
Delays possible due to Streetworks
Installation Of Street Cabinet Next To Speed Restriction Sign For Cctv at B408 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| Blythe Road, London, Hammersmith And Fulham |
| 05 October — 12 October Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| Blythe Road, London, Hammersmith And Fulham |
| 05 October — 12 October Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
| Rivercourt Road, London, Hammersmith And Fulham |
| 05 October — 28 December Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| Sinclair Road, London, Hammersmith And Fulham |
| 06 October — 08 October Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|