Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
|
| A40 Westway, London, Hammersmith And Fulham |
| 14 November — 15 November Road closure |
Delays likely due to Streetworks
Additional Epa Cleansing Full Closure & Diversions. 2359 - 0800 at A40 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
|
| A219 Wood Lane, London, Hammersmith And Fulham |
| 14 November — 15 November Some carriageway incursion |
Delays possible due to Streetworks
Installation Of Telecom Ducts And Chambers In F/W And C/W - Tm Drawings To Follow - 2 Way Traffic To Be Maintained As Per Site Meeting at A219 |
| Responsibility: euNetworks |
| EToN status: Planned work about to start |
|
|
|
| A3220 Addison Road, London, Kensington And Chelsea |
| 13 November — 14 November Some carriageway incursion |
Delays possible due to Streetworks
Maintenance: Relay- 9 Uneven Slabs 1 900 3 600 5 750 Area 3.87m Sq Part F/W Part Lane 1 at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 13 November — 15 November Some carriageway incursion |
Delays possible due to Streetworks
Core Drill Into Chamber To Connect New Client at A3220 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 13 November — 16 November Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at A4020 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
|
|
| B408 Paddenswick Road, London, Hammersmith And Fulham |
| 13 November — 13 November Some carriageway incursion |
Delays possible due to Streetworks
Trial Dig To Determine Existing Underground Services. All Slg Will Be Limited To Fw. No Cw Incursion. 1.2m Will Be Maintained For Peds. at B408 |
| Responsibility: Vodafone Group |
| EToN status: Planned work about to start |
|
|
|
| B450 Ladbroke Grove, London, Kensington And Chelsea |
| 13 November — 17 November Some carriageway incursion |
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B450 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
Information supplied by Roadworks.org
November 13, 2015
|