Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A315 Hammersmith Road, London, Hammersmith And Fulham

16 January — 17 January Traffic control (multi-way signals)

Delays likely due to Streetworks
Excavate And Install 15m 1x54mm Duct For New Customer Connection - Phase 1 at A315

Responsibility: Verizon Business

EToN status: Planned work about to start

A40 Westway, London, Hammersmith And Fulham

17 January — 17 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance Full Closure & Diversions. Saturday To Sunday. E/B. Under Tman : N1501390-001-W001 23:59 - 07:00 (Saturday To Sunday) at A40

Responsibility: Transport For London

EToN status: Planned work about to start

A219 Shepherd'S Bush Road, London, Hammersmith And Fulham

17 January — 17 January Some carriageway incursion

Delays possible due to Streetworks
Install 5m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at A219

Responsibility: BT

EToN status: Planned work about to start

A315 Hammersmith Road, London, Hammersmith And Fulham

16 January — 17 January Some carriageway incursion

Delays possible due to Streetworks
Lay Duct And Build Carriageway Box at A315

Responsibility: Vodafone Group

EToN status: Planned work about to start

A315 Hammersmith Road, London, Hammersmith And Fulham

16 January — 17 January Some carriageway incursion

Delays possible due to Streetworks
Lay Duct In Footway To Connect New Client at A315

Responsibility: Virgin Media

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

16 January — 16 January Some carriageway incursion

Delays possible due to Streetworks
Thames Water Need To Carry Out Works On The Water Valve. A Road Narrowing System Will Be Installed To Allow These Works To Be Carried Out. Minor Works, No Excavation. at A3220

Responsibility: Thames Water

EToN status: Planned work about to start

A3220 Holland Road, London, Kensington And Chelsea

17 January — 18 January Some carriageway incursion

Delays possible due to Streetworks
Maintenance: Failed Patch/Cracking Around 2 Metal Covers Part Lane 1 And Bay Suspended at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham

16 January — 20 January Some carriageway incursion

Delays possible due to Streetworks
Install New Tee In Footway To Connect New Client at A4020

Responsibility: Virgin Media

EToN status: Planned work about to start

A402 Goldhawk Road, London, Hammersmith And Fulham

17 January — 17 January Some carriageway incursion

Delays possible due to Streetworks
Clear Blockage In Footway And Any Blockage If Found. Footway Works Only. at A402

Responsibility: Virgin Media

EToN status: Planned work about to start

B408 Askew Road, London, Hammersmith And Fulham

16 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Customer Connection New Residential Supply. Clear Blocked Tee & Repair Blockages If Found, Footway Works Only at B408

Responsibility: Virgin Media

EToN status: Planned work about to start

B408 Askew Road, London, Hammersmith And Fulham

16 January — 19 January Some carriageway incursion

Delays possible due to Streetworks
Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at B408

Responsibility: Virgin Media

EToN status: Planned work about to start


 

Information supplied by Roadworks.org

 

 

 

January 16, 2016


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the