Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A315 Hammersmith Road, London, Hammersmith And Fulham

01 March — 01 March

Delays likely Lane closure

Works location: A315

Works description: 11/011 Tel0067746 - Repair Damaged Traffic Signal Detection By Slotcutting Sd5 Loops, 2000 - 2300, Ne/B Lane 1 Closed

Responsibility for works: Transport For London

Current status: Planned work about to start

B317 North End Road, London, Hammersmith And Fulham

01 March — 01 March

Delays likely Traffic control (multi-way signals)

Works location: B317

Works description: 11/011 Tel0064864 - Repair Damaged Traffic Signal Detection By Slotcutting Sd4 Loop, 2000 - 2300, S/B Lane 1 Closed Only

Responsibility for works: Transport For London

Current status: Planned work about to start

Du Cane Road, London, Hammersmith And Fulham

29 February — 29 February

Delays likely Traffic control (multi-way signals)

Works location: -

Works description: -

Responsibility for works: BT

Current status: Planned work about to start

Lime Grove, London, Hammersmith And Fulham

29 February — 04 March

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hammersmith and Fulham London Borough Council

Current status: Planned work about to start

Westway, London, Hammersmith And Fulham

29 February — 01 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start

Westway, London, Hammersmith And Fulham

29 February — 01 March

Delays likely Lane closure

Works location: -

Works description: -

Responsibility for works: Transport For London

Current status: Planned work about to start


 

Information supplied by Roadworks.org

 

 

 

February 29, 2016


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the