Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
|
|
|
|
A219 Wood Lane, London, Hammersmith And Fulham |
30 August — 31 August |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A219 |
|
|
Works description: 11/174 Tel0099447 - Access Tfl Traffic Signal Pole 1 Mast Arm, Red Aspect Out, But Will Bulk Lamp Change Whilst There. 00:01-05:00. Short Stay Works. |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
31 August — 31 August |
|
|
Delays likely Lane closure |
|
Works location: A4020 |
|
|
Works description: 11/065 Tel0061222 - Repair Damaged Traffic Signal Detection By Slotcutting Sd2 Loop, 1000 - 1500, E/B Lane 2 Closed, Switch To Lane 1 Closed, Bus Stop Suspension Requested For Stop No. 3022 |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
31 August — 31 August |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: A4020 |
|
|
Works description: 11/065 Tel0061222 - Repair Damaged Traffic Signal Detection By Slotcutting Sd0 And Sd1 Loops, 1000 - 1500 Sd0 Loop - Outside No. 246-248 - E/B Lane 2 Closed, Switch To Lane 1 Closed. Traffic Flow To Be Maintained By Two Way Temps Sd1 Loop - Opposite No. 252 - W/B Lane 2 Closed, Switch To Lane 1 Closed. Traffic Flow To Be Maintained By Two Way Temps |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 Uxbridge Road, London, Hammersmith And Fulham |
31 August — 04 September |
|
|
Delays likely Road closure |
|
Works location: A4020 |
|
|
Works description: Carriageway Resurfacing |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
31 August — 12 October |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A402 |
|
|
Works description: Kerbing Improvemetns And Cctv Ducting Installation |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Advanced planning |
|
|
|
|
Blythe Road, London, Hammersmith And Fulham |
30 August — 01 September |
|
|
Delays likely Road closure |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
Coningham Road, London, Hammersmith And Fulham |
30 August — 02 September |
|
|
Delays likely Road closure |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
Du Cane Road, London, Hammersmith And Fulham |
30 August — 30 August |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: O2 (UK) Limited |
|
|
Current status: Planned work about to start |
|
|
|
|
|
Information supplied by Roadworks.org
August 30, 2016
|