Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead

A219 Hammersmith Broadway, London, Hammersmith And Fulham

31 August — 01 September

Delays likely Lane closure

Works location: A219

Works description: Interim To Perm Of The Carriageway

Responsibility for works: Vodafone Group

Current status: Planned work about to start

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

31 August — 02 September

Delays likely Lane closure

Works location: A219

Works description: Perm Reinstatement In The Carriageway

Responsibility for works: Thames Water

Current status: Planned work about to start

A219 Wood Lane, London, Hammersmith And Fulham

30 August — 31 August

Delays likely Traffic control (multi-way signals)

Works location: A219

Works description: 11/174 Tel0099447 - Access Tfl Traffic Signal Pole 1 Mast Arm, Red Aspect Out, But Will Bulk Lamp Change Whilst There. 00:01-05:00. Short Stay Works.

Responsibility for works: Transport For London

Current status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham

31 August — 31 August

Delays likely Lane closure

Works location: A4020

Works description: 11/065 Tel0061222 - Repair Damaged Traffic Signal Detection By Slotcutting Sd2 Loop, 1000 - 1500, E/B Lane 2 Closed, Switch To Lane 1 Closed, Bus Stop Suspension Requested For Stop No. 3022

Responsibility for works: Transport For London

Current status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham

31 August — 31 August

Delays likely Traffic control (two-way signals)

Works location: A4020

Works description: 11/065 Tel0061222 - Repair Damaged Traffic Signal Detection By Slotcutting Sd0 And Sd1 Loops, 1000 - 1500 Sd0 Loop - Outside No. 246-248 - E/B Lane 2 Closed, Switch To Lane 1 Closed. Traffic Flow To Be Maintained By Two Way Temps Sd1 Loop - Opposite No. 252 - W/B Lane 2 Closed, Switch To Lane 1 Closed. Traffic Flow To Be Maintained By Two Way Temps

Responsibility for works: Transport For London

Current status: Planned work about to start

A4020 Uxbridge Road, London, Hammersmith And Fulham

31 August — 04 September

Delays likely Road closure

Works location: A4020

Works description: Carriageway Resurfacing

Responsibility for works: Hammersmith and Fulham London Borough Council

Current status: Planned work about to start

A402 Goldhawk Road, London, Hammersmith And Fulham

31 August — 12 October

Delays likely Traffic control (multi-way signals)

Works location: A402

Works description: Kerbing Improvemetns And Cctv Ducting Installation

Responsibility for works: Hammersmith and Fulham London Borough Council

Current status: Advanced planning

Blythe Road, London, Hammersmith And Fulham

30 August — 01 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hammersmith and Fulham London Borough Council

Current status: Planned work about to start

Coningham Road, London, Hammersmith And Fulham

30 August — 02 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Hammersmith and Fulham London Borough Council

Current status: Planned work about to start

Du Cane Road, London, Hammersmith And Fulham

30 August — 30 August

Delays likely Traffic control (two-way signals)

Works location: -

Works description: -

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

Masbro' Road, London, Hammersmith And Fulham

30 August — 13 September

Delays likely Road closure

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

 

Information supplied by Roadworks.org

August 30, 2016


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the