Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
A219 Scrubs Lane, London, Hammersmith And Fulham |
12 September — 19 September |
|
|
Delays likely Lane closure |
|
Works location: A219 |
|
|
Works description: 1) Footway Repaving (Western Footway). 2) Replace Exisitng Guard Rail With Visi-Rail. 3) Lay New Cctv Ducts/Draw Pits For Cameras. 4) Take Up And Relay Incorrectly Laid Tactile Paving. |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Advanced planning |
|
|
|
|
A219 Wood Lane, London, Hammersmith And Fulham |
11 September — 13 September |
|
|
Delays likely Lane closure |
|
Works location: A219 |
|
|
Works description: Perm Proposed Of Core Drill Into Existing C/W Chamber And Lay Duct In The F/W |
|
|
Responsibility for works: Vodafone Group |
|
|
Current status: Planned work about to start |
|
|
|
|
A4020 The Vale, Acton, Ealing |
12 September — 12 September |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: A4020 |
|
|
Works description: S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A40 Westway, London, Kensington And Chelsea |
12 September — 13 September |
|
|
Delays likely Lane closure |
|
Works location: A40 |
|
|
Works description: Battery Change / Maintenance Of Traffic Monitoring Equipment. Tm 1829/81 |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A40 Westway, London, Kensington And Chelsea |
12 September — 15 September |
|
|
Delays likely Road closure |
|
Works location: A40 |
|
|
Works description: Carriageway Resurfacing- Tman N1700361-001-W001 Phase 7- Lane 1 & 2 Closure. Bus Stops Suspended. Pedestrian Crossing By Bentworth Road Closed With Pedestrian Diversion. Full Closure At Junction Bloemfontien Road. Parking Suspensions In Place From The W/B Onslip To Primula Street |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Advanced planning |
|
|
|
|
Cobbold Road, London, Hammersmith And Fulham |
12 September — 12 September |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
Information supplied by Roadworks.org