Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
A3220 Holland Road |
04 September — 05 September |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: 11/091 TEL0194499 - Access TfL traffic signal pole 7, complete a bulk lamp change. 00:01-05:00. N/B lane 4. Short stay works, approx 15 mins on site. No noisy works involved |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000004114 |
|
|
|
|
A4020 Uxbridge Road |
04 September — 07 September |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: Serv Pipe Relay Ex Fitting Sz P Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU301000031068614-001 |
|
|
|
|
A40 Shepherd's Bush Green |
04 September — 07 September |
|
|
Delays likely Lane closure |
|
Works location: Unknown |
|
|
Works description: 11/004 tel0193150 - slot cut c/w sensor loops to repair traffic signals SD3 plus feed to existing chamber (f/w 2m new duct and underkerb) 22.00-05.00, noisy works completed by midnight, northbound c/w lanes 1 & 2 swapping to lanes 3 & 4 and f/w to chamber (ped access maintained) |
|
|
Responsibility for works: Transport for London |
|
|
Current status: Planned work about to start |
|
|
Works reference: YG516S000000004117 |
|
|
|
|
Bulwer Street |
03 September — 18 September |
|
|
Delays likely Road closure |
|
Works location: Unknown |
|
|
Works description: To reapir defective Kellys works on behalf of Vodafone - N506-BAYTHBEAVOD937/001 |
|
|
Responsibility for works: Vodafone |
|
|
Current status: Planned work about to start |
|
|
Works reference: NX50218JHG876 |
|
|
|
|
Cobbold Road |
03 September — 04 September |
|
|
Delays likely Traffic control (Stop/Go boards) |
|
Works location: Unknown |
|
|
Works description: Thames Water need to carry out works on the water valve. Stop & Go boards will be installed to allow these works to be carried out. Minor Works, No Excavation. |
|
|
Responsibility for works: THAMES WATER |
|
|
Current status: Planned work about to start |
|
|
Works reference: MU150WO-23770891/TW |
|
|
|
Paddenswick Road
20 August — 01 October
Delays likely Traffic control (multi-way signals)
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY
Responsibility for works: THAMES WATER
Information supplied by roadworks.org
September 3, 2018
|