Roadworks around Shepherd's Bush


Where to expect traffic delays in the days ahead


Hammersmith Grove
24 October — 27 October 
Delays possible Some carriageway incursion 
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER

A219 Shepherd's Bush Road 
24 October — 27 October 
Delays possible Some carriageway incursion 
Works description: SECTION 81- To reset surface box in Footway
Responsibility for works: Cadent 

Old Oak Road
25 October — 26 October 
Delays likely Traffic control (two-way signals)
Works description: SAHARA SURVEY FOR LEAK DETECTION. NO EXCAVATION, CHAMBER OPENING ONLY. 
Responsibility for works: THAMES WATER

Bentworth Road
24 October — 27 October 
Delays possible Some carriageway incursion 
Works description: 10m kerb tur (H Kerb/channel block alignment) 
Responsibility for works: Hammersmith and Fulham 

Brackenbury Road
25 October — 29 October 
Delays possible Some carriageway incursion 
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase 
Responsibility for works: THAMES WATER

 

October 24, 2018 

 

 

 

 


Information supplied by roadworks.org

 

 

 

 

 

 

 

 

 

 

October 24, 2018


Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the