Roadworks Around Shepherd's Bush


Where to expect traffic delays in the days ahead

A402 Goldhawk Road, London, Hammersmith and Fulham
01 July — 12 July
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Repair Thames Water leak on 30" High Pressure Main in Carriageway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU277PTML222143/01
 
Westway, London, Hammersmith and Fulham
30 June — 11 August
Delays likely Lane closure
Works location: Unknown
Works description: P4 N1902530 IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG432368154
Westway, London, Hammersmith and Fulham
01 July — 02 July
Delays likely Lane closure
Works location: Unknown
Works description: BLOCK CLOSURE WB# TESTING LIGHTS & BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430372867
A219 Wood Lane, London, Hammersmith and Fulham
03 July — 05 July
Delays likely Lane closure
Works location: Unknown
Works description: 11/003 tel0228439 - slot cut c/w sensor loops to repair traffic signals SD0 & SD1 plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, southbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG516S000000004918

 

Information supplied by roadworks.org

 

Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the