Roadworks Around Shepherd's Bush
Where to expect traffic delays in the days ahead
| A402 Goldhawk Road, London, Hammersmith and Fulham |
| 01 July — 12 July |
| Delays likely Traffic control (two-way signals) |
| Works location: Unknown |
| Works description: Repair Thames Water leak on 30" High Pressure Main in Carriageway |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU277PTML222143/01 |
| |
|
| Westway, London, Hammersmith and Fulham |
| 30 June — 11 August |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: P4 N1902530 IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG432368154 |
|
|
| Westway, London, Hammersmith and Fulham |
| 01 July — 02 July |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: BLOCK CLOSURE WB# TESTING LIGHTS & BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG430372867 |
|
| A219 Wood Lane, London, Hammersmith and Fulham |
| 03 July — 05 July |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: 11/003 tel0228439 - slot cut c/w sensor loops to repair traffic signals SD0 & SD1 plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, southbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained) |
| Responsibility for works: Transport for London |
| Current status: Planned work about to start |
| Works reference: YG516S000000004918 |
Information supplied by roadworks.org
|