Forthcoming Roadworks in Shepherd's Bush


Where to expect delays and diversions in days ahead

Road Closed sign

Westway, London, Hammersmith and Fulham

04 March — 05 March

Delays likely - Lane closure

Works location: Unknown

Works description: Cherry Picker to access telecoms pole for essential repairs. Traffic to be managed wtih a lane closure. Pedestrians to be provided with a walkway

Responsibility for works: O2 (UK) Limited

Current status: Planned work about to start

Works reference: MG06744557-COBRA-JC

A40 Westway

03 February — 06 March

Delays likely - Road closure

Works description: PTSI Structural works

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432438294

A219 Wood Lane, London, Hammersmith and Fulham

05 March — 09 March

Delays likely - Lane closure

Works location: Unknown

Works description: GPR and stat investigations

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430444652

A219 Wood Lane, London, Hammersmith and Fulham

04 March — 06 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: Install 35m of 1 way poly duct in Footway

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500290604003

A219 Wood Lane

01 March — 03 March

Delays likely - Lane closure

Works description: GPR and stat investigations

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG430444652

A4020 Uxbridge Road, London, Hammersmith and Fulham

04 March — 06 March

Delays likely - Traffic control (Stop/Go boards)

Works location: Unknown

Works description: Install 10m of 1 way poly duct in Carriageway

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500282993206

A402 Goldhawk Road, London, Hammersmith and Fulham

03 March — 05 March

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: Install 63m of 1 way poly duct in Footway,Provide 2 core drill(s) into jointbox or building

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC006TI001LC500294165700

A402 Goldhawk Road, London, Hammersmith and Fulham

03 March — 03 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: Connections Small Service:Installation of a new electricity supply for a customer:installation of a service upgrade 1ph-3ph 2 parking bay suspensions required cycle lane suspension required for temporary walkway all works to be completed within 1 day.

Responsibility for works: UK POWER NETWORKS EASTERN & LONDON

Current status: Planned work about to start

Works reference: EC40010778210

A402 Holland Park Avenue, London, Kensington and Chelsea

05 March — 05 March

Delays likely - Lane closure

Works location: Unknown

Works description: GPR and stat investigations

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432445859

A3220,A40 West Cross Route

03 February — 04 April

Delays likely - Traffic control (multi-way signals)

Works description: 11/091 - 111815 - Modernisation of the traffic signals. FW works: 08:00-05:00 extended working hours. CW Works: 19:00-05:00, no noisy works after 23:59 Site to run under pedestrian facility temp signals for the duration of works. Welfare Unit deployed to site o/s side of 205 Holland Park Avenue, 24 hours during works. J/W Holland Road: SW/B lane 1 J/W Holland Park Avenue: SE/B lane 1 and E/B lane 3 East side of Holland Park Roundabout: S/B lane 6 Lane rental exemption code: 8.(e)

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG515S000000002490

A3220 Holland Road
03 February — 04 April

Delays likely - Traffic control (multi-way signals)

Works description: 11/091 - 111815 - Modernisation of the traffic signals. FW works: 08:00-05:00 extended working hours. CW Works: 19:00-05:00, no noisy works after 23:59 Site to run under pedestrian facility temp signals for the duration of works. Welfare Unit deployed to site o/s side of 205 Holland Park Avenue, 24 hours during works. N/B lanes 3 and 4, with S/B lane 2 Lane rental exemption code: 8.(e)

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG515S000000002491

 

Information supplied by  one.network

March 3, 2020

 

 

Related links
Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Comment on this story on the