Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
A219 Butterwick, London, Hammersmith And Fulham |
19 June — 23 June Lane closure |
Delays likely due to Streetworks
Excavation - Replacement Of Existing Telecommunications Mast. Day 1 Install New Ductwork With Pedestrian Manaement. Day 2 (Sunday)Swap Existing Telecomms Mast With New Mast Using Hiab, Lane Closure In Operation. Day 3 Complete Works And Reinstate Site at A219 |
Responsibility: T-Mobile (UK)Limited |
EToN status: Planned work about to start |
|
|
A40 Westway, London, Hammersmith And Fulham |
19 June — 20 June Lane closure |
Delays likely due to Streetworks
Wp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Offside Lane Closures With Nearside Lane Running - All Vehicle Movements Maintained Eb 23:00 05:00 Slip No Nw12-0316 at A40 |
Responsibility: Transport For London |
EToN status: Advanced planning |
|
|
A40 Westway, London, Hammersmith And Fulham |
19 June — 20 June Lane closure |
Delays likely due to Streetworks
Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Offside Lane Closures With Nearside Lane Running - All Vehicle Movements Maintained Wb 23:00 To 05:00 Slip No Nw12-0316 at A40 |
Responsibility: Transport For London |
EToN status: Advanced planning |
|
|
A40 Westway, London, Hammersmith And Fulham |
19 June — 20 June Lane closure |
Delays likely due to Streetworks
Lscrp - Installation And Alignment Of Average Speed Cameras And Gps Plotting Of Capture Zone Across All Lanes. Requires Precise Plotting On Carriageway Lanes 1 & 2 Of 3 Closure, Followed By Switch To Lanes 2 & 3 Of 3, Westbound, 1000m East Of And 50m After Location Description Working Hour: 22.00 - 05.00 Weekdays at A40 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
20 June — 21 June Some carriageway incursion |
Delays possible due to Streetworks
2xdisconnections In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219 |
Responsibility: Thames Water |
EToN status: Planned work about to start |
|
|
|
|
A40 Westway, London, Hammersmith And Fulham |
20 June — 21 June Some carriageway incursion |
Delays possible due to Streetworks
Lscrp - Groundworks For The Installation Of Average Speed Equipment On Footway For 10m From Location Description Working Hour: 07.00 - 17.00 Weekend at A40 |
Responsibility: Transport For London |
EToN status: Planned work about to start |
|
|
B408 Askew Road, London, Hammersmith And Fulham |
20 June — 23 June Some carriageway incursion |
Delays possible due to Streetworks
Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at B408 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
B408 Askew Road, London, Hammersmith And Fulham |
20 June — 23 June Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Tee & Repair Blockages If Found. Footway Works Only. at B408 |
Responsibility: Virgin Media |
EToN status: Planned work about to start |
|
|
|
Information supplied by Roadworks.org
June 19, 2015
|