Roadworks around Shepherd's Bush
Where to expect traffic delays in the days ahead
A219 Wood Lane, London, Hammersmith And Fulham |
20 February — 21 February |
|
|
Delays likely Traffic control (two-way signals) |
|
Works location: A219 |
|
|
Works description: This Is To Install New Duct From The Existing Chamber In Wood Lane Corner Of The Bridge |
|
|
Responsibility for works: Vodafone Group |
|
|
Current status: Planned work about to start |
|
|
|
|
Westway, London, Hammersmith And Fulham |
21 February — 21 February |
|
|
Delays likely Road closure |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Advanced planning |
|
|
|
|
A315 Kensington High Street, London, Kensington And Chelsea |
20 February — 24 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: Build 1 Concrete Chamber 725mm X 255mm X 665mm Deep In Footway,Install 2m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
A3220 Addison Road, London, Kensington And Chelsea |
20 February — 03 March |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3220 |
|
|
Works description: Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):Excavate 2 X Lv Joint Holes Outside 18 Addison Road W14, Id Cables, Reinstatement |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
A3220 Holland Road, London, Kensington And Chelsea |
20 February — 20 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3220 |
|
|
Works description: Clear Blocked Duct& Repair Blockages If Found Footway Works Only |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
|
Information supplied by Roadworks.org