Forthcoming Roadworks in Shepherd's Bush


Where to expect delays and diversions in days ahead

Road Closed sign

Holland Road
10 August - 31 August
Delays likely - Road closure
Name: Hansard Mews
Location: Holland Road
Description: Streetworks / License - Streetworks
Responsibility for event: Kensington and Chelsea
Current status: Planned

Wood Lane
24 August — 30 September
Delays likely - Lane closure
Works location: From outside TVC Centre to J/W South Africa Road in C/way
Works description : Trial holes to prove route for new power supply for development, St James.
Responsibility for works: Hammersmith and Fulham
Current status: Planned work about to start
Works reference:  FE025LBHF_S50_0148_2020

Goldhawk Road
27 August — 03 September
Delays likely - Lane closure
Works location: NEARSIDE FOOT-WAY FEEDING 3X PROPERTIES AT NO.141
Works description : ALTER/RELAY AND LAY 2X NEW SERVICES FROM MAIN IN NEARSIDE FOOT-WAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference:  AZ7031000957384

Paddenswick Road
01 September — 14 September
Delays likely - Lane closure
Works location: O/S TC 10193 OPP 66A Paddenswick Road W6
Works description : Network Operations Maintenance: Maintenance of high voltage electricity switchgear to ensure safe and reliable power supplies: Large HV Joint Bay O/S TC 10195 to disconnect sub and large LV Joint Bay O/S Star pub Opp 66a Paddenswick Road to install new 4 way link box
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference:  EC40071031710

Stamford Brook Road
01 September — 28 September
Delays likely - Traffic control (two-way signals)
Works description : IMGA202237 ABANDON 141M X 8" DI MAIN AND INSERT 180MM PE AND RELAY ORTRANSFER SERVICES
Responsibility for works: Cadent
Current status: Advanced planning
Works reference:  AZ0071000949427

Goldhawk Road
27 August — 03 September
Delays likely - Lane closure
Works description : ALTER/RELAY AND LAY 2X NEW SERVICES FROM MAIN IN NEARSIDE FOOT-WAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference:  AZ0071000957384

Steventon Road
01 September — 04 September
Severe delays likely - Road closure
Works location: Opposite 17
Works description : Exc in CW to repair Blocked Gully
Responsibility for works: Hammersmith and Fulham
Current status: Planned work about to start
Works reference:  FE2224400307

Brook Green
27 July — 29 September
Delays likely - Lane closure
Works location: From Jct of Aynhoe Road to Jct with Hammersmith Road.
Works description : 287 Ducting installations for fibre Optic connections. Also 4 Toby Boxes and 6 x Chambers will be installed.
Responsibility for works: G. NETWORK COMMUNICATIONS LTD
Current status: Planned work about to start
Works reference:  TW03075224629