Forthcoming Roadworks in Shepherd's Bush


Where to expect delays and diversions in days ahead

Road Closed sign

Wood Lane
29 January — 12 February
Delays likely - Lane closure
Works location: From j/w A40 to o/s Browning House (opp 80 Wood Ln) in C/way
Works description : Phase 7 - HV Main Route Install - Wood Lane Power
Responsibility for works: Hammersmith and Fulham
Current status: Planned work about to start
Works reference:  FE025LBHF_S50_0138H_2020

Goldhawk Road
01 February — 12 February
Delays likely - Lane closure
Works location: Outside 156-156a Goldhawk Road W12 8EN
Works description: Thames Water works to excavate to Construct Chamber over Main, Install Gate Valve and reinstatement - existing Thames Water trunk mains identified as at risk of catastrophic failure
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU03253996223

Wood Lane
09 February — 10 February
Delays likely - Lane closure
Works location: Opp 74 W12 7RH
Works description: We need to carry out our essential works by excavating in the C/W to locate uncover and overhaul leaking critical trunk main valve, back fill and reinstate on day 2 of permit.
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU277MV6990816

Blythe Road
29 January — 14 February
Delays likely - Traffic control (multi-way signals)
Works location: Between 146 and 100
Works description: Blythe Road 4. Laying ducting for fibre connection to chambers in Blythe Road. Linked with TW018JSM-01-21-009 (Masbro Road) and TW018JSM-01-21-010 (Caithness Road).
Responsibility for works: G. Network Communications Ltd
Current status: Planned work about to start
Works reference: TW018JSM-01-21-008

Blythe Road
01 February — 18 February
Delays likely - Traffic control (two-way signals)
Works location: Olympia - Gate G c/way and f/way
Works description: Final 4MVA cable connection for Olympia development
Responsibility for works: Hammersmith and Fulham London Borough Council
Current status: Planned work about to start
Works reference: FE025LBHF_S50_0133B_2020

Old Oak Common Lane
04 January — 26 March
Delays likely - Road closure
Works location: 15-18
Works description : WATER MAINS REPLACEMENT WORKS
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference:  MU031J480-MAINS-001-02

 

Information supplied by  one.network