Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our free newsletter

Comment on this story on the

A219 Fulham Palace Road, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Queen Caroline Street, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219
Responsibility: Transport For London
EToN status: Planned work about to start
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
06 July — 17 July Road closure
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306
Responsibility: Transport For London
EToN status: Planned work about to start
A315 Hammersmith Road, London, Hammersmith And Fulham
06 July — 10 July Lane closure
Delays likely due to Streetworks
Entry Into Manhole In The Carriageway & One In The Footway Outside 72 & One In Carriageway Outside 149 In Order To Install Mechanical Sleeves & Repair Brickwork To Inner Wall Of Sewer, Night Works Over 5 Nights, Phase 1 Os 72 Signing Only, Phase 2 Oustide 149 Lane Closure, Working For Optimise at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
06 July — 07 July Lane closure
Delays likely due to Streetworks
Maintenance - Patch - Cracked Patch Around Metal Cover Part Lane 2 Closure at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A40 Westway, London, Hammersmith And Fulham
07 July — 08 July Lane closure
Delays likely due to Streetworks
11/160 Tel14281 - All Backing Boards On Site X10 Rag Are Faded Require Replacing, Note X4 Backing Boards Are On Six Meter Pole, 22:00-05:00, Ped Access Maintained. at A40
Responsibility: Transport For London
EToN status: Planned work about to start
Bradmore Park Road, London, Hammersmith And Fulham
06 July — 10 July Road closure
Delays likely due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
West Cross Route (A3220), London, Hammersmith And Fulham
07 July — 08 July Lane closure
Delays likely due to Streetworks
- at -
Responsibility: Transport For London
EToN status: Planned work about to start
A3220 Addison Crescent, London, Kensington And Chelsea
06 July — 10 July Some carriageway incursion
Delays possible due to Streetworks
Transfer Service On Columns at A3220
Responsibility: Kensington and Chelsea Royal Borough Council
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
07 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
Maintenance - Patch - Uneven Cw Surface Area 5m Sq Part Lane 1 And Part F/W Closure at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
06 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
Install New Swept Tee In Footway And Carriageway at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408
Responsibility: BT
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408
Responsibility: BT
EToN status: Planned work about to start
B415 Elgin Crescent, London, Kensington And Chelsea
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
Repair To A Damaged Service Pipe In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at B415
Responsibility: Thames Water
EToN status: Planned work about to start
Coningham Road, London, Hammersmith And Fulham
07 July — 09 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Du Cane Road, London, Hammersmith And Fulham
06 July — 08 July Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 

 

 

Information supplied by Roadworks.org

 

 

 

July 6, 2015