Roadworks around Shepherd's Bush

Where to expect traffic delays in the days ahead

Related Links

Roadworks sign

Live Travel News for Shepherd's Bush

Participate

Sign up for our Shepherd's Bush newsletter

Comment on this story on the

Westway, London, Hammersmith and Fulham
18 March — 18 November
Delays likely Road closure
Works location: Unknown
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432366318

You can see more about these works here.

A219 Wood Lane, London, Hammersmith and Fulham
18 March — 20 March
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: TO ACCESS MANHOLE TO EXISTING BT UNDERGROUND DUCTING ROUTE FOR THE PURPOSES FOR DESILTING/GULLY SUCKING AND THE CLEARANCE OF ANY BLOCKAGES ENCOUNTERED
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005KN1W000000SPHRDS-NS

 

 

 

 

 

A4020 Uxbridge Road, London, Hammersmith and Fulham

18 February — 01 April
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: MAJOR LARGE DIAMETER MAINS ABANDONMENT ABANDON 501M OF 24" GAS MAIN
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000802012

 

 

Information supplied by roadworks.org

 

 

 

 

 

 

 

 

 

 

March 18, 2019